You may remember me posting that I sent two pipes to Cajunguy for restoration. Well, He finished them today, and will be shipping them out tomorrow. They look great, and the turn around time was great as well. He got them yesterday, and finished them today. I should have them by either monday or tuesday.
Here is before:
You can't tell from the picture, but the inside of the bowl was really dirty.
This one wasn't in too bad of shape
Heres the after:
Here is before:
You can't tell from the picture, but the inside of the bowl was really dirty.
![102_5848_zps84c3b1ec.jpg](http://i1213.photobucket.com/albums/cc472/uberam3rica/102_5848_zps84c3b1ec.jpg)
This one wasn't in too bad of shape
![102_5846_zps961f1d7f.jpg](http://i1213.photobucket.com/albums/cc472/uberam3rica/102_5846_zps961f1d7f.jpg)
![102_5847_zpse1b507da.jpg](http://i1213.photobucket.com/albums/cc472/uberam3rica/102_5847_zpse1b507da.jpg)
Heres the after:
![2013-03-07145748_zpse49b930c.jpg](http://i1213.photobucket.com/albums/cc472/uberam3rica/2013-03-07145748_zpse49b930c.jpg)
![2013-03-07145553_zps0cb53e23.jpg](http://i1213.photobucket.com/albums/cc472/uberam3rica/2013-03-07145553_zps0cb53e23.jpg)
![2013-03-07145951_zps0c21758d.jpg](http://i1213.photobucket.com/albums/cc472/uberam3rica/2013-03-07145951_zps0c21758d.jpg)